Distribution Centre Fit Out in Berkshire

Location

Reading, Berkshire

Lead Time

4 weeks

Products

  • Pallet Racking
  • Mezzanine Floor
  • Fire Rated Suspended Ceiling
  • Euro Shelving

Time on site

4 days

H-Racks were awarded a contract to supply storage equipment at a new distribution centre in Reading.

A fully fire protected mezzanine floor was installed to create additional floor space at the site.

H-Racks installed Link 51 pallet racking into the warehouse.

Euro Shelving with shelf dividers was required to create a pigeon hole system for order picking and stock segregation.